IKE SKELTON CSMS BUILDING

In 2019, we designed a new paint booth, blast booth, air shower, and mixing room within the maintenance area, along with a 1,200 SF vehicle bay addition, locker rooms, a 200KW solar field, and MEP upgrades. Completed in 2021.

JEFFERSON BARRACKS

In 2018, we partnered with Raventek to build a SCIF at Jefferson Barracks Military Post, conducting structural evaluations, load calculations, code studies, and design. Due to security, project details remain classified.

MISSOURI NATIONAL GUARD

In 2018, our team partnered with the Missouri National Guard to design two decontamination units for the nation's largest Black Hawk helicopter repair facility. The units include air showers, locker rooms, showers, laundry, and restrooms. The mechanical design ensures a positive pressure environment to prevent contamination.