STATE OF MISSOURI

In 2017, our team designed an 80 KW solar power system for the Missouri National Guard, mounted with non-penetrating connections on an existing metal roof. The project included FAA coordination due to flight path considerations.

MISSOURI NATIONAL GUARD

In 2018, our team partnered with the Missouri National Guard to design two decontamination units for the nation's largest Black Hawk helicopter repair facility. The units include air showers, locker rooms, showers, laundry, and restrooms. The mechanical design ensures a positive pressure environment to prevent contamination.

FULTON STATE HOSPITAL

Our team collaborated with the Office of Administration and the Department of Mental Health to enhance patient experience and safety in the new hospital. Our design services included dining systems, medical exam rooms, office furniture, digital file systems, training equipment, recreational spaces, wayfinding signage, and artistic imagery.

MISSOURI STATE CAPITOL - 5TH FLOOR

Our team redesigned a former storage space behind the Capitol Rotunda into a redistricting office suite. Structural work included re-engineering masonry walls for a new entrance and extending the historic limestone staircase. The design featured offices, a conference room, and historically matched finishes like mahogany doors, wood trim, gold leaf stair risers, and period lighting.

HISTORIC MISSOURI STATE PENITENTIARY

The project involved excavating an 1840s cell block buried in 1902, restoring concrete, brick masonry, cut stone, and barrel-vaulted cells. Historic design included salvaging doors, hinges, and replicating period furniture.

JEFFERSON BARRACKS

In 2018, we partnered with Raventek to build a SCIF at Jefferson Barracks Military Post, conducting structural evaluations, load calculations, code studies, and design. Due to security, project details remain classified.

IKE SKELTON CSMS BUILDING

In 2019, we designed a new paint booth, blast booth, air shower, and mixing room within the maintenance area, along with a 1,200 SF vehicle bay addition, locker rooms, a 200KW solar field, and MEP upgrades. Completed in 2021.

STATE & LOCAL GOVERNMENT